Inside Your Property
- Walls, Ceilings & Finishes
- Doors, Windows & Joinery
- Kitchen & Bathrooms
Take the Keys With Confidence
A detailed check of your new villa, apartment or workplace before you accept handover, so defects go back to the developer, not your budget.
From AED 3,000 + VAT

What's Included
We check every room, inside and out, and record each finding with a photo and its location. Every inspection is done on site and ends with a written report and a walkthrough call.
Add-Ons (Priced by Scope)
Price
From AED 3,000 + VAT
Your final price depends on the property's size and scope, and we confirm it before you book.
When to Inspect
The best time is before you sign the handover form, so the developer fixes what we find before you move in. Already have the keys? You can still snag during the defects liability period, usually 12 months, while the developer must repair at no cost. A final check in the last weeks of the period catches what has appeared since handover.
How It Works
Same Working Day
Tell us the property, its size and your handover date. We reply the same working day and confirm your price before you book.
Within a Few Days
Two to five hours on site, depending on the property's size. Some checks need power and water, so please make sure both are connected.
Within Two Working Days
Findings room by room, with photos, locations and priorities, plus a walkthrough call. Use it as your snag list for the developer, or let DLP Assist prepare the submission for you.
What You Receive
FAQs
Can't find your answer? Message us and we'll reply the same working day.
WhatsApp UsFrom AED 3,000 + VAT. Your final price depends on the property's size, and we confirm it before you book.
It's the period after handover, usually 12 months, when the developer must fix defects at no cost to you. Your contract sets the exact dates, and you can still book a snag during it.
Not for the whole visit. We need access, with power and water connected. You're welcome to join at the end to see the main findings.
Yes. You can book a snag at any time during the defects liability period, while the developer must still repair defects at no cost. A check in the last weeks of the period catches what has appeared since handover.
No. Our checks are non-destructive: thermal imaging, moisture readings and simple tests. We don't open walls or remove panels. If a specialist test is needed, we explain why first.
No. During the defects liability period, the developer arranges repairs with its contractor for the defects it is liable for. Some items, such as damage after handover or normal wear, may fall outside that, and you can ask us or any contractor for a quote. Your report is yours to keep.
Enquire
Tell us about your property and your handover date. We reply the same working day and confirm your price before you book.
Or call +971 50 423 4944
—--:-- UTC+4

Cookies
We use necessary cookies to run this website and, with your consent, statistics cookies to understand how it is used. Privacy policy